Clients and Projects

Go Search

 

 CLIENT

 TITLE/DESCRIPTION

 LOCATION

Pioneer Natural Resources USA, INC.

(2010-2011)

 

Evaluated the options for increasing ethane recovery at the Satanta NRU Plant.  IPSI did the original plant design and updated models to evaluate options for enhancing the ethane recovery and provided basic engineering for the best option.

 

Satanta Gas Plant,

Kansas, USA.

 

Pioneer Natural Resources USA, INC.

(2010)

Study to evaluate Dew Point control NGL recovery schemes for gas associated with oil production from the Cherouq concession. Major equipment sizes were reported along with budgetary installed cost estimates.

 

Tunisia Gas handling,

Southwestern Region

ConocoPhillips

(2010-2011)

Evaluate technologies for handling the associated gas generated from a CO2 EOR Project. The primary objectives were the extraction of LPG (i.e. C3+) and the compression and liquefaction of the residual gases for re-injection. The technologies included in the evaluation were TEG dehydration, mole sieve dehydration, simple fractionation, Ryan-Holmes separation, membrane separation, and amine treating. Side studies evaluated refrigeration options and high pressure compression versus high pressure dense-phase pumping.

 

The study evaluated the value of the LPG product versus the energy consumption to extract it and simple payout of the capital cost for the installed equipment.

 

North Dakota, USA

Gabon Oil & Gas Assessments

(2010-2011)

As part of the overall Gabon Infrastructure Plan, has generated this Sector Assessment for the Oil & Gas industries.  This initial assessment complements sector strategies for mining and forestry to form a complete integration of the new infrastructure plan with other major industrial sectors.

 

Bechtel brought experts from its Bechtel Oil, Gas & Chemicals, Inc. division to Gabon for a 10 day in-country assessment. Working with the Infrastructure team in Gabon, these experts collected public data and held discussions with Government and industry

representatives. A data request to the Ministry of Mines and Hydrocarbons was made in October, 2010. Since these official data will be provided at a future date, the basis of this report is a combination of publicly available data and assumptions from the experience of our staff

 

Gabon,

West Africa

Pemex E&P

Mexico

(2010 – 2011)

Specialized technical assistance for Pemex of gas dew point control technology to meet sales specifications, through a screening study of state of the art technology for gas dew point control.

 

South Region

Encana Oil & Gas, USA

(2009 - 2010)

 

Performed debottlenecking study of the Fort Lupton Gas Plants (two trains) to increase C2 recovery and throughput.  A retrofit employing IPSI’S proprietary Stripping Gas Refrigeration technology was selected to increase capacity from 80 to100 MMSCFD and C2 recoveries from 40% to 60%.

Fort Lupton, CO

USA.

 

 

 

Cheniere Midstream Services LLC

(2009 – 2010)

NGL Liquids Processing Facilities

Developed process package and costs to recover ethane plus liquids from 4,300 gpm LNG  (500 MMscf/d natural gas equivalent) at the existing Sabine Pass receiving terminal. Products to be exported via truck, barges and pipelines. Assisted on the FERC application.

Sabine Pass LA USA.

 

 

 

British Gas Tunisia Ltd.

(2009 - 2010)

Analyze modified NRU to identify contributors to poor unit availability. Recommend changes to equipment and operating procedures to increase availability.   Review issues with IPSI staff which were involved in original design and finalize report. Provide limited additional support.

 

Sfax Tunisia

Pemex E&P

Mexico

(2008-2010)

Performed a feasibility study of the South Region onshore gas system (Samaria-Luna Bellota – Jujo and Muspac regions) to identify sources and recommend solutions to deal with the increasing N2 contamination.  Several N2 removal technologies were evaluated at multiple locations in the domestic gas network:  Cunducan, Jujo and

Cactus. Cryogenic technology was recommended to install in Cunduacan and Jujo. (See “IPSI/Pemex Experience”)(MAP1)

 

South Region, Mexico

 

 

 

EnCana Oil & Gas,

USA

(2008)

Evaluate impact of changing inlet gas composition on NRU performance at the Lisbon Plant (Utah). Recommended modifications to existing process to reduce methane content in the N2 vent to atmosphere.

 

Utah, USA

GreatPoint Energy

(2008)

Identify, evaluate and recommend acid gas removal technology for a proprietary coal gasification process (BluegasTM) being developed by GreatPoint Energy

 

Houston, Texas USA

 

 

Chevron Energy Technology Company

(2007)

Study to determine optimum propane refrigerant condenser (air cooler).  Design variables were:  approach temperatures, impact of instantaneous ambient air temperatures on annual NGL/LNG production and condenser surface area.

 

Houston, Texas, USA

 

ConocoPhillips

Company (2006)

 

Pre-FEED Study to evaluate options for developing two sour gas fields; review technology options; assess existing gas processing technology, exploring novel, longer term solutions; develop screening-level cost estimates.

 

Abu Dhabi

 

Chevron Energy Technology Co. (2006)

Review U.S. and Australian codes to determine applications of Carbon Steel and Low Temperature Carbon Steel for propane refrigeration system design and assess cost differences; determine impact of off design and depressurization operation.

 

Australia

 

Cheniere LNG

(2006)

Sabine Pass LNG Import Terminal – BTU Management Study.  Evaluation of N2 injection and NGL recovery options.

 

 

 

Louisiana, USA

 

Pemex E&P

Mexico

(2004 – 2007)

Master Planning and Technical assistance related to onshore and offshore oil/gas production, transportation and processing facilities in the Southern Region of Mexico.  Key issues are crude blending and processing of light, medium and heavy crudes to achieve contract specifications while optimizing the use of existing infrastructure. (See ‘IPSI/Pemex Experience’, 'MAP')

 

Southern Region, Mexico

 

Saudi Aramco

(2005)

Khursaniyah Gas Plant.  Third party “due diligence” review of process design for 95% ethane recovery, 1 bcfd capacity.

 

Saudi Arabia

 

Nexant ChemSystems

(2005)

 

 

 

 

Kazakhstan Ethane Extraction Project.  Prepared 85% C2 recovery plant design (6.4 bcm/year) including PFD’s, material and energy balance, equipment list and capital and operating cost.

Kazakhstan

 

 

 

 

 

 

Sempra Pipeline and

Storage (2005)

 

 

Revaporized LNG Phase Behavior. Mapped phase envelope for multiple composition LNG sources mixed with domestic pipeline gas.

USA

 

ChevronTexaco

(2004)

 

For Gassi Touli LNG Plant, prepared conceptual design and cost estimate for 4 MM TPA LNG/NGL liquefaction plant.

 

Algeria

 

Nexant Ltd.

(2004)

Venezuela LNG Technology Comparison Study.  Provided design and cost information based on the COP liquefaction process.

 

Venezuela

 

Abu Dhabi Gas Industries (GASCO)

(2004)

 

Habshan Gas Complex Expansion. Third party “due diligence” review of the process design including material and energy balances.  Review limited to NGL recovery, treating plants and design documents related to retrofitting existing equipment.

 

Habshan, UAE

 

Enterprise Products/ Marathon Oil Corp.

(2004)

IPSI Enhanced NGL Recovery ProcessSM License for expansion of Neptune II plant. FEED based on IPSI LLC licensed process for Neptune II Gas Plant to achieve high ethane and propane recovery (capacity 350 MMscfd). (See ‘Technical Papers’)

 

 

 

Near Morgan City,

Louisiana

 


ExxonMobil

(2004)

 

 

 

Big Escambia Creek Plant (BEC).   Prepare rebuttal and support mediation on behalf of Exxon Mobil on issues related to operation and design of BEC plant vs. royalty owners.

Alabama

 

Norsk Hydro

Oslo, Norway

(2003)

“Due diligence” review of the Ormen Lange hydrate inhibition/flow assurance design with emphasis on the MEG/water treating technology selection

 

North Sea

 

Pemex E&P

Mexico

9/2001 – 12/2003)

Master Planning assistance related to the Cantarell field and other offshore oil/gas production, specifically:

1.            Evaluation/conceptual design and placement of N2 rejection facilities required to meet Mexico’s utility gas specifications.

2.            Evaluation of N2 injection into other oil fields in the Campeche region.

3.            Feasibility study of replacing the Cantarell gas cap with N2 to free up gas for domestic use.

4.            Evaluation of light crude production and surface handling for new fields developed in the South region.

 

 

Southern Region,

Mexico

 

Repsol Investigaciones

Petroliferas SA

(RIPSA) (2003)

CASA CO­2 feasibility study to assess the technical and commercial feasibility of recovering CO2 from the Tarragona Refinery flue gases for EOR injection at RIPSA’s Casablanca offshore platform.

 

 

 

BP Amoco

Houston, Texas

(November 2001)

Process study to expand the current condensate stabilization system to handle 10,000 BPD raw condensate feed and the gas plant by 500 MMscfd additional gas flow in the dew point control mode.

 

Pascagoula, MS

 

 



PDVSA/Intevep

Caracas, Venezuela

(April 2001)

Assist PDVSA in the conceptual development of N2 injection into oil/gas reservoirs in both eastern and western Venezuela to displace associated natural gas for sale.

 

 

 

Venezuela

 

 

Norsk Hydro

Oslo, Norway

(July 2001)

Performed a third party audit of the Fram Vest subsea and topside production facilities including water separation, treatment and sales gas compression.  Investigated procedures for hydrate prevention under normal operation, startup and shutdowns; identified problem areas and recommended solutions. 

 

Norwegian North Sea

 

BP Exploration

Houston, Texas

(April 2001)

Mardi Gras Plant.  Engineering services to provide process screening/evaluation for an onshore NGL plant to be located in South Louisiana.

 

South Louisiana

 

ADNOC, Abu

Dhabi (2000)

Feasibility study to assess the technical and commercial feasibility of recovering CO2 from boilers, gas turbines and sulfur recovery units for EOR injection into the Bab Field.

 

Saudi Arabia

 


BP Amoco Egypt

Cairo, Egypt

(May 2000)

Study to determine optimum size of an LNG plant at Damietta that would use as feed gas the residual gas from an NGL facility designed for maximum propane recovery;  also estimate total installed costs for both plants.

 

Damietta, Egypt

 

 

Phoenix Park Gas Processors Ltd. (Conoco)

(1999)

Process Licensor Package for upgrade of Train I from C3 to C2 recovery using IPSI’s LRP process.  Currently evaluating Train II upgrade.

 

Point Lisas, Trinidad

 

Phoenix Park Gas Processors Ltd. (Conoco)

(1999)

Process Licensor Package for upgrade of Train I from C3 to C2 recovery using IPSI’s LRP process.  Currently evaluating Train II upgrade.

 

Point Lisas, Trinidad

 

Atlantic LNG Company

Houston, Texas

(1999)

Feasibility study, FEED package, process engineering and construction of 2nd 3+ MTPA LNG plant.  EPC by Bechtel.

 

Point Fortin, Trinidad

 


Conoco Inc.

(1999)

Screening study to evaluate cost for an LNG facility for a confidential location.  The 2.1 MTPA facility would treat, dehydrate, process to recover and fractionate a C3+ stream, produce LNG, and provide storage.

 

Confidential

 

 

Shell, The Hague

(1997)

Produced FEL package for 1.6 billion cfd natural gas plant to recover ethane and/or propane and heavier hydro-carbon liquids complete with recompression of export sales and reinjection gas. 

 

Camisea, Peru

 




Kinhill Engr. Pty. Ltd.

Adelaide, Australia

(1997)

 

Process simulation and heat/material balance for amine treating plant

Kampung Baru, Indonesia

 

Pioneer Natural Resources USA, Inc., Dallas, Texas (1997)

 

Process design and trouble-shooting for two facilities offshore.

Grand Bay and Eugene

Island Block 208

 

Norsk Hydro

Oslo, Norway

(1996)

 

Third party design verification for the Sture Terminal crude stabilization facilities.

Norway

 

Wesfarmers LPG Pty.

Ltd., Kwinana,

W. Australia (1996)

Performance Test and evaluation for 300 MMSCFD expander plant with fractionation and product treating (6300 BPD LPG)

 

Kwinana, W. Australia

 



Norsk Hydro, Norway

Third party verification for Karsto Ethane Treatment facility.  Raw ethane feed to the facility is 86 tonnes/hour; feed contains maximum 14% CO2.  Specified purified ethane is less than 100 ppm.

 

Asgard Terminal, Norway

 

ARCO Int’l. Oil &

Gas, Plano, Texas

(1995)

Evaluate workability of a heavy crude stabilizer (<10% asphaltene) and identify problem areas in design/operability of the tower concept.

 

 

 

 

British Gas Tunisia Ltd.

Houston, Texas

(1995)

Process design and engineering, HAZOP, and procurement support for the Hannibal Gas Plant.  Continued support during engineering, design and construction of the facility that included acid gas removal and nitrogen rejection (266 MMSCFD, 4200 BPD condensate).  EPCM by Bechtel.

 

Sfax, Tunisia

 

ARCO Int’l. Oil & Gas, Plano, Texas

(1995)

 

Assist ARCO process team with process problems, eg. HP dehydration, gas treating, and liquid recovery.

Qatar

 

Solgas

Lima, Peru

(1995)

Recommended a conceptual design for storage and unloading of propane and butane into a single refrigerated LPG tank; also cost estimate for EPC facilities.

 

Callao, Peru

 

Trident NGL, Inc.

The Woodlands, TX

(1995)

Review and Evaluation of Fractionation train to identify bottlenecks and equipment short- falls.

 

Waskom, Texas

 

Colorado Interstate Gas Company

Colorado Springs, CO

(1995)

Conceptual studies, Bid Package preparation, and cost estimates for the Lakin Gas Plant.  Scope included conversion of existing oil absorption plant to MDEA plus turbo-expander/cold box for He and NGL recovery with N2 rejection.  Capacity is 70 MMSCFD.

 

Lakin, Kansas

 

Pemex Exploracion y Produccion

Mexico City

Conceptual design study for the development of the Cantarell Field located in the Gulf of Mexico.  Study identified a number of projects to remove short-term production bottlenecks and increase long-term production of the field.

 

Gulf of Mexico

 


Trident NGL Inc./Amoco The Woodlands, Texas

(1995)

Conducted studies, prepared bid package, and cost estimates for replacement of the existing Jayhawk NGL/He recovery/nitrogen rejection plant (550 MMSCFD, 20,000 BPD NGL, 1.83 MMSCFD Helium)

 

Jayhawk, Kansas

 

Kinhill Engineering Pty. Ltd.  Adelaide, Australia

(1995)

Assisted with detailed Engineering Procure-ment, and Construction Management support on the Santos Ethane Treatment Project.

 

Moomba, Australia

 

BPOI/Department Of Energy (1994)

Process Assistance to the Elk Hills Petroleum Reserve

 

Bakersfield, California

Mesa, Inc.

Amarillo, Texas

(1993)

Conducted Feasibility studies, FEED and Bid Package preparation, cost estimates, and EPC Bid Package evaluation for the Mesa Satanta Gas Plant (250 MMSCFD).  Continued support during engineering, design, and construction of the facility which included a cold box with helium recovery, nitrogen rejection and NGL recovery

 

Ulysses, Kansas

 

Mesa, Inc.

Amarillo, Texas

(1993)

Conducted Feasibility studies, FEED and Bid Package preparation, cost estimates, and EPC Bid Package evaluation for the Mesa Fain II Gas Plant (120 MMSCFD).  Continued support during engineering, design, and construction of the facility, which included a cold box with helium recovery, acid gas removal, and NGL recovery.

 

Amarillo, Texas

 

Trident NGL, Inc.

The Woodlands, TX

(1993)

Provided process design package to expand LPG fractionation plant capacity from 90,000 to 112,000 BPD.  Represented client as project manager for EPC.

 

 

 

Mt. Belvieu, Texas

Bechtel Energy

Houston, Texas

(1993)

Feasibility study for 500 MMSCFD gas production, recycling and condensate production on the North Urengoi Field Development Project (500 MMSCFD, 26,000 BPD NGL)

 

Western Siberia

Phillips Petroleum Co. Bartlesville, OK

(1993)

Various feasibility studies, FEED package preparations and compressor studies for LNG plants using Phillips Optimized Cascade Liquefaction Process.

 

Various

 


Total, France

Feasibility study for 1.1 and 3 MTPA LNG plants

 

Yemen

 

Phillips Petroleum Co. Bartlesville, OK

(1993)

Optimization study applying Pinch technology for LNG plant design using Phillips Optimized Cascade Liquefaction Process.

 

 

 

CIPI

Mexico City, Mexico

(1993)

Process study to optimize the 34 existing Pemex production facilities to improve efficiency and safety (1.7 BSCFD, 600 BPD Oil).

 

 

 

 

 

 

 

Mexico

Maxus Exploration Corporation

Dallas, Texas

(1992)

Conceptual studies, Bid Package preparation and process design/evaluation for two plants, 80 MMSCFD each; included cold box technology with NGL/Helium recovery/N2 rejection, H2S/CO2 removal and sulfur plant; also turboexpander design for NGL recovery only.

 

Sunray, Texas

 

Conoco Global Power Inc., Houston, Texas

Conceptual design and cost estimate for natural gas purification plant as part of the utilities outsourcing package.

 

Hainan Island, China

 

Phillips Petroleum Co. Bartlesville, OK

FEED package preparation for 3.3 MTPA LNG plant

 

Darwin, Australia

 

Statoil Company Norway

Conceptual study for 3.6 MTPA LNG plant

 

Sleitner, Norway

 

Mobil Power Inc.

Singapore

 

Conceptual study for LNG receiving terminal

 

 

Limay, Philippines

 

Texaco/Mobil

Houston, Texas

Feasibility study for 6.6 MTPA LNG plant in two trains

 

Barrow Island, Australia

 

PAC RIM

Feasibility study and FEED package for 3.5 MTPA LNG plant

 

British Columbia, Canada

 

British Petroleum Houston, Texas

Conceptual study for 3.3 MTPA LNG plant

 

 

Papua New Guinea

 

British Gas/Amoco

Houston, Texas

 

Conceptual study for 3 MTPA LNG plant

Brighton, Trinidad

 

Abu Dhabi National

Oil Company

Assistance in the gas development project for treating 1.2 BSCFD of sour gas, NGL recovery and 3000 T/D of sulfur recovery, plus fractionation, product treating, and condensate stabilization and pipelines (113,000 bpd NGL)

 

Abu Dhabi

Corpoven,

S.A. Venezuela

Prepared plant and personnel for performance test to determine maximum throughput of extraction plant to determine feasibility of upcoming revamp

 

Anaco, Venezuela

 

 

 

Intevep S.A.

Matura, Venezuela

 

 

 

Consulting Services related to solving asphalt deposition problems on gas pipelines in Eastern Venezuela

 

 

Texaco Chemical Company

Process design and preparation of a front end engineering package to produce 400 MM lbs/year of propylene oxide and 14,000 bbls/ day of MTBE

 

 

Wesfarmers LPG Pty. Ltd., Kwinana,              W. Australia (1991)

Identification of bottlenecks created by changes in feed composition for the Kwinana gas liquid recovery plant

 

Kwinana, W. Australia

ARCO Research & Dev.

Plano, Texas (1990)        

 

Design and fabrication of fuel test separator with very short residence time.  Partners with H. O. Mohr Research & Engineering.

 

North Slope, Alaska

QGPC

Qatar

(1991)

Technical assistance related to the process control of the North Field Development Facilities. Included offshore stabilization and onshore cryogenic gas processing. Continued support during engineering, design and construction of the facility.  EPC by Bechtel.

 

Umm Said, Qatar

Lagoven S.A.

Caracas, Venezuela

(1989)

Feasibility study for H2, LPG and olefins recovery facilities in refinery.  Evaluated oil absorption, membrane, PSA, and cryogenic processes.

 

Amuay, Venezuela

Norsk Hydro

Oslo, Norway 

Hazop study/technical audit of Oseberg II production, processing facilities.

 

Norwegian North Sea

Phillips Petroleum Co. Midland/Odessa, TX

(1989)

 

Technical audit of four (4) gas treating plants in west Texas converted to UCARSOL

Various Texas Locations

Amoco Production Houston, TX

Technical assistance related to LOCAT and Enhanced Oil Recovery facilities in several locations, including operator training, at Anschutz N2 EOR, Wasson CO2 EOR, Painter N2 EOR, Anton Irish CO2 EOR

 

 

 

 

 

West Texas and Wyoming

 

Corpoven, S.A. Venezuela

(1989)

Study to minimize production losses of 55,000 BPD extraction facility to increase throughput from 800 MMSCFD to 1000 MMSCFD. Included 70,000 BPD fractionation facility being modified to handle 100 MBPD.

 

Puerto La Cruz, Venezuela

Phillips Petroleum Bartlesville, OK

Debottlenecking Study including developing Predictive Model

 

 

Kenai, Alaska

Phillips Petroleum Bartlesville, OK

 

Expansion Study of the Kenai LNG Plant

Kenai, Alaska

Texaco Chemical Co. Houston, TX

Process Design and Engineering Support for Cryogenic LPG/H2 Recovery Plant

 

Pt. Arthur, Texas

Star Chemical Company

Engineering Support for 1450 GPM MEA Treating and 400 TPD SRU

 

 

Amoco Production Co. Denver, CO

Miscellaneous Support: Gas Plant Auto-mation, Operational Support

 

Denver Region

Alta Mesa Resources Houston, Texas

Miscellaneous Support of Blackjack Creek Plant Acquisition

 

 

Florida

Amoco Canada

Calgary, Canada (1990)

Gas Treating and Sulfur Recovery Training Workshop

 

Calgary, Canada

Intevep S.A.

Caracas, Venezuela

Technical Assistance Related to a CO2 EOR Pilot Project in Eastern Venezuela

 

San Tome, Venezuela

Corpoven S.A.           

Technical assistance related to the expansion of the San Joaquin gas plant and CO2-removal facilities.

 

Anaco, Venezuela

Warren Petroleum Co.

Tulsa, Oklahoma

Expert testimony related to litigation regarding the Como gas processing and N2 rejection facilities.  Included CO2 and H2S removal with sulfur recovery.

 

Sulphur Springs, Texas

Mesa Limited Partnership Amarillo, Texas

(1987-88)

Expert testimony related to litigation associated with the design of the Fain gas processing plant including the N2 rejection and ethane extraction facilities.

 

Amarillo, Texas

Intevep S.A.

Evaluation of state-of-the-art technology for recovery of CO2 and study methods for dehydration, compression and transportation of CO2 for EOR.  Two potential CO2 sources were flue gas from natural gas fired boilers and offgas from hydrogen plant.

 

Venezuela


Maraven S.A.

Analysis of future requirements of handling heavy crude produced from steam injection.  Evaluation of various methods to dehydrate crude, treat and dispose of produced water.

 

Venezuela

Norsk Hydro

Oslo, Norway

(1988)

 

Management of dynamic simulation of Oseberg subsea oil pipeline system including tie-ins with Veslefrikk.

 

Norwegian North Sea

 

 

 


Exxon Chemicals

Process design and engineering for installation of new facilities and modification of existing equipment for BTX extraction. Plant capacity increased from 41,000 to 78,000 B/SD of feedstock.

Baytown, Texas