CLIENT |
TITLE/DESCRIPTION |
LOCATION |
|
|
Chevron Energy
Technology Company
(2007) |
Study to
determine optimum propane refrigerant condenser (air cooler).
Design variables were: approach temperatures, impact of
instantaneous ambient air temperatures on annual NGL/LNG production
and condenser surface area.
|
Houston, Texas,
USA |
|
|
ConocoPhillips
Company
(2006)
|
Pre-FEED Study
to evaluate options for developing two sour gas fields; review
technology options; assess existing gas processing technology,
exploring novel, longer term solutions; develop screening-level cost
estimates.
|
Abu Dhabi |
|
|
Chevron Energy
Technology Co. (2006) |
Review U.S. and
Australian codes to determine applications of Carbon Steel and Low
Temperature Carbon Steel for propane refrigeration system design and
assess cost differences; determine impact of off design and
depressurization operation.
|
Australia |
|
|
Cheniere LNG
(2006) |
Sabine Pass LNG
Import Terminal – BTU Management Study. Evaluation of N2
injection and NGL recovery options.
|
Louisiana, USA |
|
|
Pemex E&P
Mexico
(2004 – 2007) |
Master Planning
and Technical assistance related to onshore and offshore oil/gas
production, transportation and processing facilities in the Southern
Region of Mexico. Key issues are crude blending and processing of
light, medium and heavy crudes to achieve contract specifications
while optimizing the use of existing infrastructure.
(See ‘IPSI/Pemex
Experience’) (MAP)
|
Southern Region,
Mexico |
|
|
Saudi Aramco
(2005) |
Khursaniyah Gas
Plant. Third party “due diligence” review of process design for 95%
ethane recovery, 1 bcfd capacity.
|
Saudi Arabia |
|
|
Nexant
ChemSystems
(2005)
|
Kazakhstan
Ethane Extraction Project. Prepared 85% C2 recovery
plant design (6.4 bcm/year) including PFD’s, material and energy
balance, equipment list and capital and operating cost. |
Kazakhstan
|
|
|
Sempra Pipeline
and Storage (2005)
|
Revaporized LNG
Phase Behavior. Mapped phase envelope for multiple composition LNG
sources mixed with domestic pipeline gas. |
USA |
|
|
ChevronTexaco
(2004)
|
For Gassi Touli
LNG Plant, prepared conceptual design and cost estimate for 4 MM TPA
LNG/NGL liquefaction plant.
|
Algeria |
|
|
Nexant Ltd.
(2004) |
Venezuela LNG
Technology Comparison Study. Provided design and cost information
based on the COP liquefaction process.
|
Venezuela |
|
|
Abu Dhabi Gas
Industries (GASCO)
(2004)
|
Habshan Gas
Complex Expansion. Third party “due diligence” review of the process
design including material and energy balances. Review limited to
NGL recovery, treating plants and design documents related to
retrofitting existing equipment.
|
Habshan, UAE |
|
|
Enterprise
Products/
Marathon Oil Corp.
(2004) |
IPSI Enhanced
NGL Recovery ProcessSM License for expansion of Neptune
II plant. FEED based on IPSI LLC licensed process for Neptune II Gas
Plant to achieve high ethane and propane recovery (capacity 350
MMscfd). (See ‘Technical
Papers’)
|
Near Morgan
City, Louisiana |
|
|
ExxonMobil
(2004)
|
Big Escambia
Creek Plant (BEC). Prepare rebuttal and support mediation on
behalf of Exxon Mobil on issues related to operation and design of
BEC plant vs. royalty owners. |
Alabama |
|
|
Norsk Hydro
Oslo, Norway
(2003) |
“Due diligence”
review of the Ormen Lange hydrate inhibition/flow assurance design
with emphasis on the MEG/water treating technology selection
|
North Sea |
|
|
Pemex E&P
Mexico
9/2001 –
12/2003) |
Master Planning
assistance related to the Cantarell field and other offshore oil/gas
production, specifically:
1. Evaluation/conceptual
design and placement of N2 rejection facilities required
to meet Mexico’s utility gas specifications.
2. Evaluation
of N2 injection into other oil fields in the Campeche
region.
3.
Feasibility study of replacing the Cantarell gas cap with N2
to free up gas for domestic use.
4. Evaluation
of light crude production and surface handling for new fields
developed in the South region.
|
Southern Region,
Mexico |
|
|
Repsol
Investigaciones
Petroliferas SA
(RIPSA)
(2003) |
CASA CO2
feasibility study to assess the technical and commercial feasibility
of recovering CO2 from the Tarragona Refinery flue gases
for EOR injection at RIPSA’s Casablanca offshore platform.
|
|
|
|
BP Amoco
Houston, Texas
(November 2001) |
Process study to
expand the current condensate stabilization system to handle 10,000
BPD raw condensate feed and the gas plant by 500 MMscfd additional
gas flow in the dew point control mode.
|
Pascagoula, MS
|
|
|
PDVSA/Intevep
Caracas, Venezuela
(April
2001) |
Assist PDVSA in
the conceptual development of N2 injection into oil/gas reservoirs
in both eastern and western Venezuela to displace associated natural
gas for sale.
|
Venezuela
|
|
|
Norsk Hydro
Oslo, Norway
(July 2001) |
Performed a
third party audit of the Fram Vest subsea and topside production
facilities including water separation, treatment and sales gas
compression. Investigated procedures for hydrate prevention under
normal operation, startup and shutdowns; identified problem areas
and recommended solutions.
|
Norwegian North
Sea |
|
|
BP Exploration
Houston, Texas
(April 2001) |
Mardi Gras
Plant. Engineering services to provide process screening/evaluation
for an onshore NGL plant to be located in South Louisiana.
|
South Louisiana |
|
|
ADNOC, Abu
Dhabi (2000) |
Feasibility
study to assess the technical and commercial feasibility of
recovering CO2 from boilers, gas turbines and sulfur
recovery units for EOR injection into the Bab Field.
|
Saudi Arabia |
|
|
BP Amoco Egypt
Cairo, Egypt
(May 2000) |
Study to
determine optimum size of an LNG plant at Damietta that would use as
feed gas the residual gas from an NGL facility designed for maximum
propane recovery; also estimate total installed costs for both
plants.
|
Damietta, Egypt
|
|
|
Phoenix Park Gas
Processors Ltd. (Conoco)
(1999) |
Process Licensor
Package for upgrade of Train I from C3 to C2 recovery using IPSI’s
LRP process. Currently evaluating Train II upgrade.
|
Point Lisas,
Trinidad |
|
|
Phoenix Park Gas
Processors Ltd. (Conoco)
(1999) |
Process Licensor
Package for upgrade of Train I from C3 to C2
recovery using IPSI’s LRP process. Currently evaluating Train II
upgrade.
|
Point Lisas,
Trinidad |
|
|
Atlantic LNG
Company
Houston, Texas
(1999) |
Feasibility
study, FEED package, process engineering and construction of 2nd
3+ MTPA LNG plant. EPC by Bechtel.
|
Point Fortin,
Trinidad |
|
|
Conoco Inc.
(1999) |
Screening study
to evaluate cost for an LNG facility for a confidential location.
The 2.1 MTPA facility would treat, dehydrate, process to recover and
fractionate a C3+ stream, produce LNG, and provide
storage.
|
Confidential
|
|
|
Shell, The Hague
(1997) |
Produced FEL
package for 1.6 billion cfd natural gas plant to recover ethane
and/or propane and heavier hydro-carbon liquids complete with
recompression of export sales and reinjection gas.
|
Camisea, Peru |
|
|
Kinhill Engr.
Pty. Ltd.
Adelaide, Australia
(1997)
|
Process
simulation and heat/material balance for amine treating plant |
Kampung Baru,
Indonesia |
|
|
Pioneer Natural
Resources
USA, Inc.,
Dallas, Texas (1997)
|
Process design
and trouble-shooting for two facilities offshore. |
Grand Bay and
Eugene
Island Block 208 |
|
|
Norsk Hydro
Oslo, Norway
(1996)
|
Third party
design verification for the Sture Terminal crude stabilization
facilities. |
Norway |
|
|
Wesfarmers LPG
Pty. Ltd., Kwinana,
W. Australia
(1996) |
Performance Test
and evaluation for 300 MMSCFD expander plant with fractionation and
product treating (6300 BPD LPG)
|
Kwinana, W.
Australia |
|
|
Norsk Hydro,
Norway |
Third party
verification for Karsto Ethane Treatment facility. Raw ethane feed
to the facility is 86 tonnes/hour; feed contains maximum 14% CO2.
Specified purified ethane is less than 100 ppm.
|
Asgard Terminal,
Norway
|
|
|
ARCO Int’l. Oil
& Gas,
Plano, Texas
(1995) |
Evaluate
workability of a heavy crude stabilizer (<10% asphaltene) and
identify problem areas in design/operability of the tower concept.
|
|
|
|
British Gas
Tunisia Ltd.
Houston, Texas
(1995) |
Process design
and engineering, HAZOP, and procurement support for the Hannibal Gas
Plant. Continued support during engineering, design and
construction of the facility that included acid gas removal and
nitrogen rejection (266 MMSCFD, 4200 BPD condensate). EPCM by
Bechtel.
|
Sfax, Tunisia |
|
|
ARCO Int’l. Oil
& Gas,
Plano, Texas
(1995)
|
Assist ARCO
process team with process problems, eg. HP dehydration, gas
treating, and liquid recovery. |
Qatar
|
|
|
Solgas
Lima, Peru
(1995) |
Recommended a
conceptual design for storage and unloading of propane and butane
into a single refrigerated LPG tank; also cost estimate for EPC
facilities.
|
Callao, Peru |
|
|
Trident NGL,
Inc.
The Woodlands, TX
(1995) |
Review and
Evaluation of Fractionation train to identify bottlenecks and
equipment short- falls.
|
Waskom, Texas |
|
|
Colorado
Interstate
Gas Company
Colorado Springs, CO
(1995) |
Conceptual
studies, Bid Package preparation, and cost estimates for the Lakin
Gas Plant. Scope included conversion of existing oil absorption
plant to MDEA plus turbo-expander/cold box for He and NGL recovery
with N2 rejection. Capacity is 70 MMSCFD.
|
Lakin, Kansas |
|
|
Pemex
Exploracion
y Produccion
Mexico City |
Conceptual
design study for the development of the Cantarell Field located in
the Gulf of Mexico. Study identified a number of projects to remove
short-term production bottlenecks and increase long-term production
of the field.
|
Gulf of Mexico |
|
|
Trident NGL
Inc./Amoco
The Woodlands, Texas
(1995) |
Conducted
studies, prepared bid package, and cost estimates for replacement of
the existing Jayhawk NGL/He recovery/nitrogen rejection plant (550
MMSCFD, 20,000 BPD NGL, 1.83 MMSCFD Helium)
|
Jayhawk, Kansas
|
|
|
Kinhill
Engineering Pty. Ltd. Adelaide, Australia
(1995) |
Assisted with
detailed Engineering Procure-ment, and Construction Management
support on the Santos Ethane Treatment Project.
|
Moomba,
Australia
|
|
|
BPOI/Department
of Energy
(1994) |
Process
Assistance to the Elk Hills Petroleum Reserve
|
Bakersfield,
California
|
|
|
Mesa, Inc.
Amarillo, Texas
(1993) |
Conducted
Feasibility studies, FEED and Bid Package preparation, cost
estimates, and EPC Bid Package evaluation for the Mesa Satanta Gas
Plant (250 MMSCFD). Continued support during engineering, design,
and construction of the facility which included a cold box with
helium recovery, nitrogen rejection and NGL recovery
|
Ulysses, Kansas
|
|
|
Mesa, Inc.
Amarillo, Texas
(1993) |
Conducted
Feasibility studies, FEED and Bid Package preparation, cost
estimates, and EPC Bid Package evaluation for the Mesa Fain II Gas
Plant (120 MMSCFD). Continued support during engineering, design,
and construction of the facility, which included a cold box with
helium recovery, acid gas removal, and NGL recovery.
|
Amarillo, Texas |
|
|
Trident NGL,
Inc.
The Woodlands, TX
(1993) |
Provided process
design package to expand LPG fractionation plant capacity from
90,000 to 112,000 BPD. Represented client as project manager for
EPC.
|
Mt. Belvieu,
Texas |
|
|
Bechtel Energy
Houston, Texas
(1993) |
Feasibility
study for 500 MMSCFD gas production, recycling and condensate
production on the North Urengoi Field Development Project (500
MMSCFD, 26,000 BPD NGL)
|
Western Siberia |
|
|
Phillips
Petroleum Co.
Bartlesville, OK
(1993) |
Various
feasibility studies, FEED package preparations and compressor
studies for LNG plants using Phillips Optimized Cascade Liquefaction
Process.
|
Various |
|
|
Total, France |
Feasibility
study for 1.1 and 3 MTPA LNG plants
|
Yemen |
|
|
Phillips Petroleum Co.
Bartlesville, OK
(1993) |
Optimization
study applying Pinch technology for LNG plant design using Phillips
Optimized Cascade Liquefaction Process.
|
|
|
|
CIPI
Mexico City, Mexico
(1993) |
Process study to
optimize the 34 existing Pemex production facilities to improve
efficiency and safety (1.7 BSCFD, 600 BPD Oil).
|
Mexico |
|
|
Maxus
Exploration Corporation
Dallas, Texas
(1992) |
Conceptual
studies, Bid Package preparation and process design/evaluation for
two plants, 80 MMSCFD each; included cold box technology with NGL/Helium
recovery/N2 rejection, H2S/CO2
removal and sulfur plant; also turboexpander design for NGL recovery
only.
|
Sunray,Texas
|
|
|
Conoco Global
Power Inc., Houston, Texas |
Conceptual
design and cost estimate for natural gas purification plant as part
of the utilities outsourcing package.
|
Hainan Island,
China
|
|
|
Phillips
Petroleum Co.
Bartlesville, OK |
FEED package
preparation for 3.3 MTPA LNG plant
|
Darwin,
Australia |
|
|
Statoil Company
Norway |
Conceptual study
for 3.6 MTPA LNG plant
|
Sleitner, Norway |
|
|
Mobil Power Inc.
Singapore
|
Conceptual study
for LNG receiving terminal |
Limay,
Philippines |
|
|
Texaco/Mobil
Houston, Texas |
Feasibility
study for 6.6 MTPA LNG plant in two trains
|
Barrow Island,
Australia |
|
|
PAC RIM |
Feasibility
study and FEED package for 3.5 MTPA LNG plant
|
British
Columbia, Canada |
|
|
British
Petroleum
Houston, Texas |
Conceptual study
for 3.3 MTPA LNG plant
|
Papua New Guinea |
|
|
British
Gas/Amoco
Houston, Texas |
Conceptual study
for 3 MTPA LNG plant
|
Brighton,
Trinidad |
|
|
Abu Dhabi
National
Oil Company |
Assistance in
the gas development project for treating 1.2 BSCFD of sour gas, NGL
recovery and 3000 T/D of sulfur recovery, plus fractionation,
product treating, and condensate stabilization and pipelines
(113,000 bpd NGL)
|
Abu Dhabi |
|
|
Corpoven,
S.A. Venezuela |
Prepared plant
and personnel for performance test to determine maximum throughput
of extraction plant to determine feasibility of upcoming revamp
|
Anaco, Venezuela |
|
|
Intevep S.A.
Matura, Venezuela |
Consulting
Services related to solving asphalt deposition problems on gas
pipelines in Eastern Venezuela
|
|
|
|
Texaco Chemical
Company |
Process design
and preparation of a front end engineering package to produce 400 MM
lbs/year of propylene oxide and 14,000 bbls/ day of MTBE
|
|
|
|
Wesfarmers LPG
Pty. Ltd., Kwinana,
W. Australia (1991) |
Identification
of bottlenecks created by changes in feed composition for the
Kwinana gas liquid recovery plant
|
Kwinana, W.
Australia |
|
|
ARCO Research &
Dev.
Plano, Texas (1990)
|
Design and
fabrication of fuel test separator with very short residence time.
Partners with H. O. Mohr Research & Engineering.
|
North Slope,
Alaska |
|
|
QGPC Qatar
(1991)
|
Technical
assistance related to the process control of the North Field
Development Facilities. Included offshore stabilization and onshore
cryogenic gas processing. Continued support during engineering,
design and construction of the facility. EPC by Bechtel.
|
Umm Said, Qatar |
|
|
Lagoven S.A.
Caracas, Venezuela
(1989) |
Feasibility
study for H2, LPG and olefins recovery facilities in
refinery. Evaluated oil absorption, membrane, PSA, and cryogenic
processes.
|
Amuay, Venezuela |
|
|
Norsk Hydro
Oslo, Norway |
Hazop
study/technical audit of Oseberg II production, processing
facilities.
|
Norwegian North
Sea |
|
|
Phillips
Petroleum Co. Midland/Odessa, TX
(1989)
|
Technical audit
of four (4) gas treating plants in west Texas converted to UCARSOL |
Various Texas
Locations |
|
|
Amoco Production
Houston, TX |
Technical
assistance related to LOCAT and Enhanced Oil Recovery facilities in
several locations, including operator training, at Anschutz N2
EOR, Wasson CO2 EOR, Painter N2 EOR, Anton
Irish CO2 EOR
|
West Texas and
Wyoming
|
|
|
Corpoven,
S.A. Venezuela
(1989) |
Study to
minimize production losses of 55,000 BPD extraction facility to
increase throughput from 800 MMSCFD to 1000 MMSCFD. Included 70,000
BPD fractionation facility being modified to handle 100 MBPD.
|
Puerto La Cruz,
Venezuela |
|
|
Phillips
Petroleum
Bartlesville, OK |
Debottlenecking
Study including developing Predictive Model
|
Kenai, Alaska |
|
|
Phillips
Petroleum
Bartlesville, OK
|
Expansion Study
of the Kenai LNG Plant |
Kenai, Alaska |
|
|
Texaco Chemical
Co.
Houston, TX |
Process Design
and Engineering Support for Cryogenic LPG/H2 Recovery
Plant
|
Pt. Arthur,
Texas |
|
|
Star Chemical
Company |
Engineering
Support for 1450 GPM MEA Treating and 400 TPD SRU
|
|
|
|
Amoco Production
Co.
Denver, CO |
Miscellaneous
Support: Gas Plant Auto-mation, Operational Support
|
Denver Region |
|
|
Alta Mesa
Resources
Houston, Texas |
Miscellaneous
Support of Blackjack Creek Plant Acquisition
|
Florida |
|
|
Amoco Canada
Calgary, Canada
(1990) |
Gas Treating and
Sulfur Recovery Training Workshop
|
Calgary, Canada |
|
|
Intevep S.A.
Caracas, Venezuela |
Technical
Assistance Related to a CO2 EOR Pilot Project in Eastern
Venezuela
|
San Tome,
Venezuela |
|
|
Corpoven
S.A. |
Technical
assistance related to the expansion of the San Joaquin gas plant and
CO2-removal facilities.
|